Jandco’s scope included electrical design, manufacture, supply, construction, installation, testing, and commissioning work on water infrastructure assets.
This project presented several unique challenges we needed to address in our approach:
We approached the works in a flexible manner as we were tasked with identifying the full scope of requirements to restore or replace the existing water assets that were damaged in the Fitzroy River flood.
Once the works were fully identified, Jandco worked with other contractors to repair a number of existing switchboards, repair existing bore sites, and replace a damaged switchboard that was beyond repair. This then enabled us to contact Horizon Power and have power restored to all the sites as required.
We were able to have the power reconnected to a number of the sites relatively quickly once we were engaged, helping restore essential water services to the Darlgunya Community.